How much concrete for a 30×30 slab?
A 30×30 ft slab (900 ft²) poured 4 inches thick needs 12.22 yd³ of concrete (9.345 m³) including 10% extra for waste. In pre-mixed bags that is 550 × 80 lb, 734 × 60 lb or 1100 × 40 lb bags.
Enter your measurements
Concrete needed
12.22 yd³ (330 ft³)
- Or 40 lb bags
- 1100 bags
- Or 60 lb bags
- 734 bags
- Or 80 lb bags
- 550 bags
- Without waste allowance
- 11.11 yd³ (300 ft³)Exact geometric volume
Quick reference
| Thickness | Concrete needed | 80 lb bags | 60 lb bags | 40 lb bags |
|---|---|---|---|---|
| 4 in | 12.22 yd³ (330 ft³) | 550 bags | 734 bags | 1100 bags |
| 5 in | 15.28 yd³ (412.5 ft³) | 688 bags | 917 bags | 1375 bags |
| 6 in | 18.33 yd³ (495 ft³) | 825 bags | 1100 bags | 1650 bags |
Frequently asked questions
How many 80 lb bags of concrete for a 30×30 slab?
550 bags for a 4 inch slab, including 10% extra. Without the extra it is exactly 11.11 yd³ (300 ft³).
How many yards of concrete for a 30×30 slab?
12.22 yd³ at 4 inches thick with 10% extra. Ready-mix suppliers usually sell in 0.25 or 0.5 yd³ steps, so round up to the next increment.
Should I use bags or ready-mix?
Bags are practical up to roughly 1-2 yd³ (about 45-90 × 80 lb bags) if you have a mixer and helpers. Beyond that, ready-mix is usually cheaper per yard and gives a stronger, more consistent pour.
Other sizes
Need a different size? Use the full concrete calculator or pick a common project: